A Complete MEP Suite for RV Parks in South Carolina

Project Type: Commercial
Software Used: Revit 2023, COMcheck
Project Duration: 72 Hours (Approx 4 weeks)

Task Assigned

The client, R Reina Designs, assigned National MEP Engineers to produce a complete MEP design suite for RV Park Simpsonville, South Carolina, which included designing HVAC, Electrical, and Plumbing Systems for the Office and the Recreational room.

Project Timeline

  • Phase 1 – Basis of Design and Concept Planning
  • Phase 2 – Design Development – Preliminary HVAC, Electrical and Plumbing
  • Phase 3 – Construction Document – Finalisation of drawings and specifications

Additional Notes

  • The project required us to deliver within a tight timeline while ensuring the final drawings met all permit requirements.
  • We optimized our design workflow with early coordination and proactive planning, ensuring the project was completed on time with fully compliant, permit-ready drawings.